Tag: 2814Isleville
-
2814 Isleville.
-
2814 Isleville.
-
2814 Isleville weekly update.
-
2814 Isleville rising above the ground.
-
Bonus 2814 Isleville!
-
2814 Isleville weekly update.
-
2814 Isleville weekly update.
-
2814 Isleville weekly update. Not sure if it was plumbing or electrical but there was piping being encased in concrete. The future mechanical room is where the piping leads to.
-
2814 Isleville weekly update.
-
2814 Isleville. Work continues on the interior walls forming the future parkade lobby. The elevator shaft can easily been seen. The half wall has been poured underneath the future parkade access ramp (see outline on right).
-
2814 Isleville weekly update.
-
At 2814 Isleville the south (Almon St) parkade wall has been waterproofed and gravel fill is now in place where the sidewalk will be located. Blasting is completed on site and the resulting gravel is now 15’ high.
-
2814 Isleville
-
2814 Isleville
-
Thanks to Partners Global for this rendering of 2814 Isleville!
-
-
North End revival featuring (from left) 2814 Isleville, 3065 Robie, & Junior Ranks cranes!
-
Foundation footings being poured at 2814 Isleville.
-
2814 Isleville weekly update.
-
2814 Isleville’s crane is up!
-
2814 Isleville
-
2814 Isleville
-
2814 Isleville. Portions of the south and east walls were poured today. 07/29/2014
-
2814 Isleville. Framing is now up for half of the parkade’s southern exterior wall. The sidewalk will be widened into the 5ft set-back and street trees will be planted along the power lines. (07/28/2014)
-
2814 Isleville weekly update.